|
|
|
Major Projects |
|
|
The constant endeavour of the Shri Mata Vaishnodevi Shrine Board is
to keep
augmenting the facilities for pilgrims visiting the Holy
Shrine.
Some of the ongoing and upcoming major projects of
SMVDSB are as under:
|
- Construction of Durga Bhawan at Bhawan for increasing the
accommodation of Yatris.
- Multipurpose Audio-Video System of SMVDSB track.
- Underground Cabling Project on SMVDSB track.
- Construction of Administrative Block & Faculty Blocks of
SMVDCoN.
- CCTV Surveillance Project on SMVDSB track.
- Redesigning of Bhojanalayas on SMVDSB track.
- Slope Stabilization Project on SMVDSB track to ensure safe
yatra route.
- Exit track extension at Bhawan.
- Track widening between X-Ray point at Gate No.3 and Army Gate.
- Re-routing of Yatra near Bhairon Ji Mandir.
|
|
|
|